Nissan Maxima QX

since 1993 of release

Repair and car operation



Nissan Maxima QX
+ Nissan Maxima brand Cars
+ Maintenance instruction
+ Settings and routine maintenance
+ Engine
+ Systems of cooling, heating
+ Power supply system and release
+ engine Electric equipment
+ Control systems of the engine
- Transmission
   - 5-step manual box of gear shifting (RKPP)
      General information
      Removal and installation of components of a drive of gear shifting
      Replacement of epiploons
      Check and replacement of the sensor switch of fires of a backing
      Removal and RKPP installation
      Major maintenance of RKPP
   + 4-step automatic transmission (AT)
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment





9a1e70e9



Removal and RKPP installation

Details of installation of a case of a transmission

1 — a coupling Dome
2 — the Epiploon
3 — Maslotok (a secondary shaft)
4 — RKPP Interfaced to a case a surface of a dome of coupling
5 — the Epiploon of a power shaft
6 — the Bolt (20 ÷ 29 Nanometer)
7 — the Boot
8 — the Sealing cuff
9 — the Magnetic segment
10 — the Oil trench

11 — the Oil pocket
12 — the Sensor switch of fires of a backing
13 — the Sealing ring
14 — the Epiploon of a power shaft
15 — the Drain stopper (25 ÷ 34 Nanometer)
16 — Carter RKPP
17 — Maslotok (primary shaft)
18 — the Bolt (16 ÷ 21 Nanometer)
19 — Clamping a bolt (3.7 ÷ 5.0 Nanometer)

REMOVAL

 PERFORMANCE ORDER

1. Remove the battery with the pallet (see. Head engine Electric equipment).
2. Remove an air purifier with the MAF sensor and an air inlet (see. Head of the Power supply system and release).

3. Remove from RKPP case the executive cylinder of a hydraulic actuator of coupling (see. Head Coupling and power shafts). Release a clamp and liberate the hydraulic line of a drive of coupling from the basic arm on RKPP case.

 Do not allow squeezing of a pedal of coupling at the removed executive cylinder.

4. Disconnect electroconducting from VSS (see. Section Replacement of epiploons). Disconnect grounding tires.
5. On models since 1995 вып. remove the sensor of provision of a cranked shaft (see. Head of the Control system of the engine).
6. Remove from a transmission case starter assembly (see. Head engine Electric equipment).

7. Turn out the top bolts of fastening of a case of a transmission.

 Bolts of fastening of transmission to the engine have various length and are not interchangeable therefore at their reversing it is necessary to mark accurately.

8. Weaken nuts of fastening of forward wheels. To Poddomkratta the car also establish it on props. Remove forward wheels.
9. Disconnect electroconducting from sensors switches of fires of a backing and disconnection of a chain of a starter (see. Section Check and replacement of the sensor switch of fires of a backing).
10. Remove section of system of release of the fulfilled gases passing under the power unit (see. Head of the Power supply system and release).
11. Merge transmission oil (see. Head of Control and routine maintenance).
12. Disconnect a basic bar and a rod of management of gear shifting from transmission (see. Section Removal and installation of components of a drive of gear shifting).
13. Remove power shafts (see. Head Coupling and power shafts).
14. Prop up the engine a jack (for distribution of loading lay between a head of a jack and the case pallet wooden whetstone). The engine should remain propped up during all time while the transmission will be removed from the car.
15. Prop up a transmission a telezhechny jack and fix it on a jack safety chains.
16. Remove the central cross-section beam passing under assembly of the power unit.
17. Slightly raise assembly of the power unit and disconnect the left support of its suspension bracket. At the corresponding complete set of the car turn out also bolts of fastening of the pallet of a case of the engine to transmission (see. Head Engine).
18. Turn out the remained bolts of fastening of a dome of coupling to the engine block.
19. Last time make sure that all communications are disconnected and nothing disturbs office and transmission removal.

20. To Priopustita propping-up engine a jack also start to displace RKPP assembly aside, separating it from the unit. After the pin of primary shaft will completely be liberated from a nave of a conducted disk of coupling, omit assembly and take it from under the car. Try, whenever possible not to incline the transmission removed from the car.

21. Taking an opportunity, check a condition of components of coupling (see. Head Coupling and power shafts). Performance of replacement of coupling regardless of its current state will be a good form.

INSTALLATION

 PERFORMANCE ORDER

1. If removed, establish into place coupling components (see. Head Coupling and power shafts).
2. Fix transmission on a jack as did it in the course of dismantle, and carefully get it under the car, having lifted in regular situation. Accurately enter primary shaft into gearing with shlitsa of a nave of a conducted disk of coupling, see to hit of directing pins in reciprocal openings in an interfaced surface of the engine. At all do not apply force, - if primary shaft does not enter into a nave of a disk of coupling, adjust a tilt angle of a transmission and slightly turn a shaft, achieving the correct combination шлицов.

 At all do not tighten the warped transmission to the engine by means of fixing bolts, is can lead to an irreversible exit of components out of operation!

3. Screw bolts of fastening of RKPP to the engine. Tighten fixture with demanded effort.

4. Connect a support of a suspension bracket of the power unit (track reliability of a tightening of fixture).
5. Establish into place a support of a suspension bracket of transmission and a cross-section beam.
6. Clean the jacks which are propping up a box and the engine. Establish into place all transmissions acting in film in the course of dismantle components (see respectively Chapters of the Power supply system and release, Electric equipment of the engine and the Control system of the engine).
7. Make sure in correctness of connection and laying of electric and hydraulic lines. Track, that in a transmission the necessary amount of transmission oil of a demanded grade (was filled in see. Head of Control and routine maintenance). Lower the car on the earth.
8. Connect a negative wire to the battery. Make trial runs of the car, check the engine and a transmission on existence of signs of development of leaks.